Building a private house: explanatory note or permit in BIS

A new private house is applied for in the Construction Information System (BIS), and the municipal building authority (būvvalde) reviews the plan. A group-2 single-dwelling house with a total area of up to 200 m² needs only an explanatory note (paskaidrojuma raksts), reviewed in 10 working days. A larger house needs a minimum-scope design and a building permit, decided within a month. Construction may start only once the start-of-works conditions are marked as fulfilled.

Service passportUpdated: 09.11.2026.
Cost
Main costs are design and construction specialists; ask the building authority about any municipal charges
Duration
Explanatory note — 10 working days; permit — 1 month; start-of-works mark — 5 working days
Deadline
The plan must be carried out within 5 years of acceptance
Where
bis.gov.lv, municipal building authority
Open BIS
✓ Information verified: 2026-11-09 Report an error

Who this applies to

Landowners or lawful holders planning a new house or outbuilding, or rebuilding an existing one. An explanatory note covers group-1 buildings, a group-2 single-dwelling house up to 200 m², a factory-built house up to 200 m², and rebuilding a one- or two-dwelling house without changing its use. Otherwise a building permit is required. The municipality may require extra approval in its binding regulations.

Step by step

Check the rules and which process applies

Check the municipal spatial plan and building rules for your plot. For a single-dwelling house of up to 200 m² total area, use the explanatory note; for a larger house or more dwellings (new build), file a construction application and get a building permit.

Hire a designer and get technical conditions

Sign a contract with a designer or construction specialist and prepare the design brief together. If technical conditions are needed (e.g. electricity, road access), state and municipal bodies issue them within 11 working days, utility owners free of charge within 11 working days (extendable to 20).

Submit the plan in BIS

On bis.gov.lv fill in the explanatory note or construction application and attach the documents. The authority publishes the plan in BIS within 3 working days. An explanatory note is accepted in 10 working days; a permit is decided within a month. Explanatory-note cases follow a silence-is-consent rule: if the authority does not decide or mark the start-of-works conditions in time, a favourable decision is deemed taken.

Meet the start-of-works conditions

Submit the documents required by the explanatory note or permit (e.g. contractor and site supervisor details). Within 5 working days the authority marks the start-of-works conditions as met — only then may you build. With a permit, a mark on design conditions (15 working days) is needed first.

Finish and register the house

The plan must be carried out within 5 years of acceptance. After construction, file documents in BIS for acceptance into service or a completion mark; from BIS data you can also file the cadastre registration and the Land Register application for the new building.

Common mistakes

Starting work before the start-of-works mark — with an explanatory note, a warning or a fine of up to 15 penalty units for an individual.
Building without an explanatory note or permit — individuals can be fined up to 400 penalty units.
Using an explanatory note for a house over 200 m² — that needs a permit.
Missing the 5-year completion window.

Frequently asked questions

Does a house up to 200 m² need a permit?

No — a new group-2 single-dwelling house with a total area up to 200 m² uses an explanatory note. The municipality may require an approval in its binding rules.

How long does the authority take?

Explanatory note acceptance: 10 working days; permit: within a month; design-conditions mark: 15 working days; start-of-works mark: 5 working days.

Can I prepare the documents myself?

For explanatory-note cases you may prepare documents yourself for your own group-1 dwelling or a group-1/2 outbuilding of up to two storeys, with a footprint up to 400 m² and volume up to 2,000 m³. A group-2 single-dwelling house needs a construction specialist.

Can the decision be challenged?

Yes — a decision accepting the plan or granting a permit can be challenged or appealed within a month under the Administrative Procedure Law.